logologo

Project Overview - Proposed Scheme

Footbridge B is proposed to be built on the west side of Tai Chung Road (near the industrial area) and north of Hoi Shing Road. The revised plan of Footbridge B is as follows:

Footbridge B Layout Out (click to enlarge)

Tai Chung Road - NF186 to NF167 Artist's Impression

Tai Chung Road (near D.Park)

Artist's Impression of Footbridge B along Tai Chung Road (near D.Park)

Tai Chung Road - NF167 to NF166 Preliminary Artist's Impression

Tai Chung Road (near Hoi Shing Road)

Artist's Impression of Footbridge B along Tai Chung Road (near Hoi Shing Road)

Hoi Shing Road Artist's Impression

Hoi Shing Road

Artist's Impression of Footbridge B along Hoi Shing Road